Projects

Digging the oil pipeline trench

Completed
  • Client
    Kar Group
  • Location
    From Kashi power station toward Arbil
  • Start Date
    2013

This contract was held on 21 April 2013 trenches length (25 km) and the width of the road (30 m) starting from Smeal to 40 km in Faysh Khabur. length of the trench (1.5 m) and depth (1.71)

Check out our latest version of
Dara Company Profile, Here.

Get in Touch

Dara Company

AAsia Road, Pariwar Street,
Duhok, KRG, Iraq

T+964 (750) 489 6677